스위스
스위스

myGeobrugg

Western Portal of Hirschhorn Tunnel

비탈면 보강 시스템 - Western Portal of Hirschhorn Tunnel 2020

Netting covering the rockface

비탈면 보강 시스템 - Western Portal of Hirschhorn Tunnel 2020

Entrance of the Hirschhorn Tunnel

비탈면 보강 시스템 - Western Portal of Hirschhorn Tunnel 2020

Drilling works

비탈면 보강 시스템 - Western Portal of Hirschhorn Tunnel 2020

Building with netting in background

비탈면 보강 시스템 - Western Portal of Hirschhorn Tunnel 2020

Connection with shackles

비탈면 보강 시스템 - Western Portal of Hirschhorn Tunnel 2020

Rockface with mesh protection

 

Year of installation

2020

Situation

The western portal of the Hirschhorn Tunnel on the German B37 federal road had to be protected. In 2011/2012 already sections above the tunnel portal and above the maintenance depot had been stabilized. This protection was completed in 2020.

Geology

The secured rock face mainly consists of quartzite-bound sandstone from the middle Buntsandstein. Coarsely laminated clayey sandstones with a thickness of 0.1 to 2.0 m are embedded in the massive, thickly banked sandstones.

Description

SPIDER® S3-130 spiral cable net plus TECCO® G65/3 mesh plus shotcrete, were used to secure the remaining section.

After a thorough excavation and clearing of loose material, micro piles were placed in a grid of 2.5 x 2.5 m.

A SPIDER® spiral rope netting, and in fissured areas additionally shotcrete, secure the steep areas. TECCO® mesh was installed in the flatter slope area.

Protected object

Road, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail