瑞士
瑞士

myGeobrugg

Western Portal of Hirschhorn Tunnel

边坡稳定 - Western Portal of Hirschhorn Tunnel 2020

Netting covering the rockface

边坡稳定 - Western Portal of Hirschhorn Tunnel 2020

Entrance of the Hirschhorn Tunnel

边坡稳定 - Western Portal of Hirschhorn Tunnel 2020

Drilling works

边坡稳定 - Western Portal of Hirschhorn Tunnel 2020

Building with netting in background

边坡稳定 - Western Portal of Hirschhorn Tunnel 2020

Connection with shackles

边坡稳定 - Western Portal of Hirschhorn Tunnel 2020

Rockface with mesh protection

 

安装年份

2020

情况

The western portal of the Hirschhorn Tunnel on the German B37 federal road had to be protected. In 2011/2012 already sections above the tunnel portal and above the maintenance depot had been stabilized. This protection was completed in 2020.

地質學

The secured rock face mainly consists of quartzite-bound sandstone from the middle Buntsandstein. Coarsely laminated clayey sandstones with a thickness of 0.1 to 2.0 m are embedded in the massive, thickly banked sandstones.

描述

SPIDER® S3-130 spiral cable net plus TECCO® G65/3 mesh plus shotcrete, were used to secure the remaining section.

After a thorough excavation and clearing of loose material, micro piles were placed in a grid of 2.5 x 2.5 m.

A SPIDER® spiral rope netting, and in fissured areas additionally shotcrete, secure the steep areas. TECCO® mesh was installed in the flatter slope area.

防护对象

Road, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址