스위스
스위스

myGeobrugg

Shimizu district North-South

비탈면 보강 시스템 - Shimizu district North-South 2016

23'770 m² of high tensile TECCO® G65/3 mesh with GEOBRUGG SUPERCOATING® + PET corrosion protection covers the slope today - with minimal visual impact

비탈면 보강 시스템 - Shimizu district North-South 2016

Before installation of high tensile TECCO® G65/3 mesh - the slope is already nailed and covered with anti-erosion mat

비탈면 보강 시스템 - Shimizu district North-South 2016

Closer view of the fully protected slope - the slope is getting a natural look

비탈면 보강 시스템 - Shimizu district North-South 2016

After installation - showing the dimension of the whole project

비탈면 보강 시스템 - Shimizu district North-South 2016

Panorama view with TECCO® installation in the background - roads and rivers in the valley are protected now

 
 

Year of installation

2016

Situation

The typhoon no. 12 that crossed West Japan in September 2011 brought torrential rain to the Gojo Nara area and caused largescale landslides. The collapsed earth and sand flowed into the rising river, and even reached the opposite shore.

Description

For the restoration of the collapsed area, Kumonosu Net using high tensile steel wire mesh TECCO® System was selected taking into account the large number of installation results, reasonable design and price, workability at high place, quick installation and landscape.

Customer

Kii Mountain District SABO Office

Protected object

Road, Residential area

Corrosion protection

GEOBRUGG SUPERCOATING + PET

Engineering

Japan Conservation Engineers & Co.,Ltd.

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail