Schweiz
Schweiz

myGeobrugg

Shimizu district North-South

Böschungsstabilisierung - Shimizu district North-South 2016

23'770 m² of high tensile TECCO® G65/3 mesh with GEOBRUGG SUPERCOATING® + PET corrosion protection covers the slope today - with minimal visual impact

Böschungsstabilisierung - Shimizu district North-South 2016

Before installation of high tensile TECCO® G65/3 mesh - the slope is already nailed and covered with anti-erosion mat

Böschungsstabilisierung - Shimizu district North-South 2016

Closer view of the fully protected slope - the slope is getting a natural look

Böschungsstabilisierung - Shimizu district North-South 2016

After installation - showing the dimension of the whole project

Böschungsstabilisierung - Shimizu district North-South 2016

Panorama view with TECCO® installation in the background - roads and rivers in the valley are protected now

 
 

Installationsjahr

2016

Ausgangslage

The typhoon no. 12 that crossed West Japan in September 2011 brought torrential rain to the Gojo Nara area and caused largescale landslides. The collapsed earth and sand flowed into the rising river, and even reached the opposite shore.

Massnahme

For the restoration of the collapsed area, Kumonosu Net using high tensile steel wire mesh TECCO® System was selected taking into account the large number of installation results, reasonable design and price, workability at high place, quick installation and landscape.

Kunde

Kii Mountain District SABO Office

Geschützte Objekte

Strasse, Wohngebiet

Korrosionsschutz

GEOBRUGG SUPERCOATING + PET

Planer

Japan Conservation Engineers & Co.,Ltd.

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail