스위스
스위스

myGeobrugg

토석류 및 산사태 방호 시스템 - Bridge Solldamm 2004

VX debris flow barrier protecting Solldamm bridge, being at the time of installation, one of the first barriers of its kind

토석류 및 산사태 방호 시스템 - Bridge Solldamm 2004

Solldamm bridge before installation - visible the outlet which needed protection

토석류 및 산사태 방호 시스템 - Bridge Solldamm 2004

The anchoring of the debris flow barrier was executed with a walking excavator with drill rig onboard

 

Systems

 

System length

16 m - 16 m

 

Year of installation

2004

Situation

The outlet below the bridge has a square size of 1.5 m x 1.5 m. Because of the karstic rocks, heavy rains can lead to large quantities of water flowing through the gully in a very short time, carrying wood and debris with it.

Description

Optimal protection with minimal efforts was found as Geobrugg's VX debris flow or mudslide barrier, being at that time one of the first such installations.

Customer

Department for Forests, Canton of Grison, Rhine Vally, Schanfigg

Contractor

Ribbert AG, Mels

Protected object

Road, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

Joggi Felix

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail