瑞士
瑞士

myGeobrugg

泥石流和滑坡防护 - Bridge Solldamm 2004

VX debris flow barrier protecting Solldamm bridge, being at the time of installation, one of the first barriers of its kind

泥石流和滑坡防护 - Bridge Solldamm 2004

Solldamm bridge before installation - visible the outlet which needed protection

泥石流和滑坡防护 - Bridge Solldamm 2004

The anchoring of the debris flow barrier was executed with a walking excavator with drill rig onboard

 

系统

 

系统长度

16 m - 16 m

 

安装年份

2004

情况

The outlet below the bridge has a square size of 1.5 m x 1.5 m. Because of the karstic rocks, heavy rains can lead to large quantities of water flowing through the gully in a very short time, carrying wood and debris with it.

描述

Optimal protection with minimal efforts was found as Geobrugg's VX debris flow or mudslide barrier, being at that time one of the first such installations.

客户

Department for Forests, Canton of Grison, Rhine Vally, Schanfigg

承包商

Ribbert AG, Mels

防护对象

Road, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Joggi Felix

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址