낙석방호시스템 - Muriwai Drive 2019

Looking east up the property - note pressure post and undulating allignment

낙석방호시스템 - Muriwai Drive 2019

Close up of post base - note drag net and proximity to property boundary

낙석방호시스템 - Muriwai Drive 2019

Looking north - fence allignment and gap fill kit

 
 

시스템 길이

16 m

 

설치 년도

2019

Situation

A rock and tree fall hazard on an existing property created the requirement for a custom rockfall barrier. The site was narrow (17 m wide), had difficult access and no flat alignments.

Description

The system selected was a 16 m long, 3 m high GBE-1000A-R with pressure posts, drag nets and a gap fill kit.
Below is a list of custom features:

Fixed Post -  no upslope anchors due to proximity of alignment to property boundary
Pressure Posts - no lateral anchors meant barrier could be installed over full property width
Drag Nets - enabled the shorter barrier to have the required deflection to absorb the 1000 kJ energy event
Gap Fill Kit - enabled the  barrier to contour the difficult alignment

Country/Region

뉴질랜드

Customer

Private

Contractor

Rock Control, www.rockcontrol.co.nz

Protected object

Building

부식방지

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Your local contact

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

자연 재해
수리학
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / 미국 Regional Manager Northeast

이메일

Saleh Feidi
 

Saleh Feidi

자연 재해
수리학
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국

이메일

John Kalejta
 

John Kalejta

자연 재해
수리학
Geobrugg North America, LLC,KS 67226 Wichita / 미국

이메일

Bob Lyne
 

Bob Lyne

자연 재해
수리학
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / 미국

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

이메일

Tim Shevlin
 

Tim Shevlin

자연 재해
Geobrugg North America, LLC,OR 97302 Salem / 미국

이메일