스위스
스위스

myGeobrugg

비탈면 보강 시스템 - Piwniczna Zdrój DW971 2017

Fortified stone wall with TECCO® SYSTEM³

비탈면 보강 시스템 - Piwniczna Zdrój DW971 2017

Retaining stone wall before stabilization

비탈면 보강 시스템 - Piwniczna Zdrój DW971 2017

Inobtrusive security with a steel wire mesh

 
 

Year of installation

2017

Situation

The section from Piwniczna to Krynica on the road 971 leads through a mountainous area. In the past retaining stone walls had been built in several sections.

Due to erosion and temperature changes, some walls required stabilization in order to prevent parts of the wall from falling on the road.

Description

A 70 meters long wall was secured with ground nails and a mesh - with TECCO® System.

The solution maintains the stability of the retaining wall without tearing down the old stone wall. The mesh also prevents loose parts from falling on the road.

Check also the Piwniczna Zdrój DW97 rockfall project.

Customer

ZDW oddział Kraków

Contractor

BMD Sp. z o.o.

Protected object

Road

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

BMD Sp. z o.o.

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

자연 재해
유압 공학
채굴 / 터널
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 스위스 Ticino Country Manager

E-Mail