瑞士
瑞士

myGeobrugg

边坡稳定 - Piwniczna Zdrój DW971 2017

Fortified stone wall with TECCO® SYSTEM³

边坡稳定 - Piwniczna Zdrój DW971 2017

Retaining stone wall before stabilization

边坡稳定 - Piwniczna Zdrój DW971 2017

Inobtrusive security with a steel wire mesh

 
 

安装年份

2017

情况

The section from Piwniczna to Krynica on the road 971 leads through a mountainous area. In the past retaining stone walls had been built in several sections.

Due to erosion and temperature changes, some walls required stabilization in order to prevent parts of the wall from falling on the road.

描述

A 70 meters long wall was secured with ground nails and a mesh - with TECCO® System.

The solution maintains the stability of the retaining wall without tearing down the old stone wall. The mesh also prevents loose parts from falling on the road.

Check also the Piwniczna Zdrój DW97 rockfall project.

客户

ZDW oddział Kraków

承包商

BMD Sp. z o.o.

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

工程

BMD Sp. z o.o.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址