İsviçre
İsviçre

myGeobrugg

Saint Beat (Haute Garonne)

Kaya düşmesine karşı koruma - Saint Beat (Haute Garonne) 2020

The first Attenuator System in France

Kaya düşmesine karşı koruma - Saint Beat (Haute Garonne) 2020

The attenuator extends over a length of 60 meters.

 

Sistemler

 

Sistem uzunluğu

6 m

 

Kurulum Yılı

2020

Durum

The quarry, situated in the French Pyrenees, was affected by frequent rockfalls.

Açıklama

An attenuator ATT 60 was installed to protect the endangered zone of the quarry. This attenuator is the first of its kind in France.

Post height: 4 meters
Width: 60 meters

Müşteri

Yüklenici

Gauthier SA

Gösterilen obje

Mine / Quarry

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Ginger-IMS RN St Gaudens (31)

Kurulan diğer uygulamalar

Madencilik / Tüneller

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta