Kaya düşmesine karşı koruma - Carrière de Michelau N27 2014

Overview of the protection measures that were implemented

Kaya düşmesine karşı koruma - Carrière de Michelau N27 2014

Situation after completion of the RXI-Barriers, before starting the road work

Kaya düşmesine karşı koruma - Carrière de Michelau N27 2014

A combination of barriers protect the commuting traffic against rockfall

Kaya düşmesine karşı koruma - Carrière de Michelau N27 2014

Dam alongside the road: stabilized with TECCO G65/3 and equipped with a GBE-100A-R barrier

Kaya düşmesine karşı koruma - Carrière de Michelau N27 2014

GBE-100A-R placed on concrete foundations to be anchored into the condensed dam material

 

Sistem uzunluğu

64 m - 78 m

 

Kurulum Yılı

2014

Durum

Former Quarry along the road N27, next to Erpeldange-Michelau

Close to the location Michelau (Luxemburg) on a steep, north exposed rock slope in a former limestone quarry, a rockfall incident with a volume of around 1000 m³ ocurred. The cliff spreads along a distance of around 300 meters and reaches a maximum height of 30 meters. It is located on an eroding bank of the river Sure.

As an emergency measure the road was rerouted to the other side of the river, via a provisional bridge. Since further examiniation of the cliff showed a constant risk to the remaining road, rockfall protection measures had to be taken.

Açıklama

The rockfall protection measures installed along the cliff are two RXI-500 Barriers:

  • Barrier RXI 500, Length 78 m, Height  5.5 m
  • Barrier RXI 500, Length 64 m, Height  7.0 m

The rockfall protection measures installed on the dam towards the road are:

  • 1.7 m² TECCO G65/3 to stabilize the dam itself and atop
  • A small GBE-100 AR rockfall barrier, Length 70 m, Height 2.0 m

Müşteri

Ministère du développement durable et des infrastructures, Adm. des Ponts et Chaussées, Division de la Voirie de Diekirch

Yüklenici

GEO HAZARDS BV

Gösterilen obje

Road, Touristic infrastructure

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Dr. Spang GmbH, Witten, Germany

Alt yüklenici

CAN Benelux

Kurulan diğer uygulamalar

Şev ve Yamaç koruma

Yerel yetkiliniz

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / Amerika Birleşik Devletleri Regional Manager Northeast

e-posta

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / Amerika Birleşik Devletleri Regional Manager California

e-posta

John Kalejta
 

John Kalejta

Regional Manager Central US

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / Amerika Birleşik Devletleri Regional Manager Central US

e-posta

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Natural Hazards
Hidrolik mühendisliği
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / Amerika Birleşik Devletleri Regional Manager Southeast

e-posta

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Natural Hazards
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

e-posta

Tim Shevlin
 

Tim Shevlin

Sales Director

Natural Hazards
Geobrugg North America, LLC,Salem OR 97302 / Amerika Birleşik Devletleri Sales Director

e-posta