Селевые потоки и микросели - Königstein, Saxony 2012

The installed UX060L-H4 barrier from the top - below the protected railway and the road

Селевые потоки и микросели - Königstein, Saxony 2012

Geology of the construction site - visible material which could be potentially triggered and form a debris flow

Селевые потоки и микросели - Königstein, Saxony 2012

Overview of the torrents endangering the infrastructure below

Селевые потоки и микросели - Königstein, Saxony 2012

For the transport of construction material a temporary, inclined elevator platform was installed

Селевые потоки и микросели - Königstein, Saxony 2012

Anchor drilling was executed from the temporary platform

Селевые потоки и микросели - Königstein, Saxony 2012

UX060L-H4 debris flow barrier's post already connected with the ground plate - with a very elegant fundament

Селевые потоки и микросели - Königstein, Saxony 2012

Barrier anchor drilling was executed using mobile drilling devices

Селевые потоки и микросели - Königstein, Saxony 2012

Detailed view of Geobrugg's wire rope anchors: anchor head with double corrosion protection, ensuring long lasting and maintenance free usage

Селевые потоки и микросели - Königstein, Saxony 2012

Closer look on the UX060L-H4 debris flow barrier after installation was finished in May, 2012

Селевые потоки и микросели - Königstein, Saxony 2012

The UX060L-H4 debris flow barrier from below - thanks to its lightweight structure, all installation works could be executed by hand

 

Системы

 

Длина системы

7 m - 25 m

 

Год установки

2012

Ситуация

The railway track from Dresden to Děčin (Czech Republic) experienced heavy rain that triggered several mudslides in August 2010.  They blocked the railway line and the parallel road next to the city of Königstein.

This area shows signs of weathering and slope erosion. Blocks with an edge length up to two meters are embedded and shows first signs of instabilities.

The slope has an average inclination of 30 to 35 degrees and thanks to two torrents creating Y shape can mobilize up to 100 m³ of debris flow material.

Описание

Based on data collected in September 2010, the debris flow barrier was dimensioned using our DEBFLOW software. The optimum location for the barrier was a terrain transition in a flume area with undisturbed edge structure. The embankments on both sides offered fully extensive anchoring options.

Клиент

City of Königstein

Подрядчик

Bergsicherung Freital GmbH

Защищаемый объект

Дорога, Железнодорожная линия

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

Geobrugg AG

Представитель в Вашем регионе

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / США Regional Manager Northeast

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / США Regional Manager California

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Central US

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / США Regional Manager Central US

Электронная почта

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / США Regional Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Sales Director

Инженерная защита
Geobrugg North America, LLC,Salem OR 97302 / США Sales Director

Электронная почта