Svizzera
Svizzera

myGeobrugg

Piwniczna-Zdrój: National Road DK87

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The National Road DK87 near Piwniczna-Zdrój is protected with Geobrugg's rockall barriers - this road along the Polish-Slovakian border is facing a lot of touristic traffic

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The National Road DK87 during renovation works - the dense forest makes it difficult to assess the possible risk

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

During the DK87 renovation works many rockfalls were spotted and it was decided to install rockfall barriers

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The National Road DK87 in Piwniczna-Zdrój protected by a GBE-500A rockfall barrier

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

Sandstone outcrops are hidden in the forest endangering the road

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

The GBE-500A is the most cost effective rockfall barrier in its class - also due to its unique simplicity

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

GBE-500A barrier border details - visible unique U-brake elements offering long lasting performance

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

Another area of the National Road DK87 protected with a GBE-100A-R rockfall barrier

Protezione da caduta massi - Piwniczna-Zdrój: National Road DK87 2016

As an extra safety measure, a small, customized debris flow barrier was also installed

 

Lunghezza del sistema

72 m - 252 m

 

Anno di installazione

2016

Situazione iniziale

Along the Polish-Slovakian border a new border crossing (new bridge above Poprad river) was built. That also caused a need of a National Road DK87 renovation. During construction works it was decided to install also a rockfall protection.  

Descrizione

Four barrier lines were designed. The very fast installation took place in September 2016.

Cliente

Generalna Dyrekcja Dróg Krajowych i Autostrad (National Roads Directory)

Contraente:

BMD Sp. z o.o.

Oggetto protetto

Strada

Protezione dalla corrosione

Galvanized, GEOBRUGG SUPERCOATING

Progettazione:

BMD Sp. z o.o.

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail