myGeobrugg
2011
The Polish A1 highway connecting Poland from south to north leads through Silesia. Because of the morphology of the terrain, deep cuts were required. Due to geological conditions and also due to the fact that this area is strongly influenced by the hard coal mining activity, slope stabilization was a must.
Marls, silts, sandstones and limestones.
For the following reasons designers together with the Polish National Roads selected TECCO® System as a stabilizing solution:
TECCO® System was designed to protect local instabilities of soil and rock masses. This worked perfectly, as first visible small movements occurred which were stopped by the TECCO® System mesh shortly after installation.
General Directorate of National Roads and Motorways
BUDIMEX S.A.
Strada
GEOBRUGG SUPERCOATING
Complex Project Sp. z o.o. / Transprojekt Kraków Sp. z o.o.
Stump-Hydrobudowa Sp. z o.o. / Italcementaciones S.L.U. / PPI Chrobok S.A. / ZRI Chrobok sp.j.