Rebuilding the Ahrtal

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

Rockfall protection barrier with rockfall area above. The ring nets that absorb energy in the event of a rockfall are visible.

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

View of the railroad line during reconstruction. On the left: anchored safety nets on the steep embankment, earthworks and construction work in progress in the foreground.

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

Close-up of an RXE-2000 rockfall barrier.

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

Overview of a larger embankment element with several offset net levels - the safety measures follow the natural terrain profile for optimum slope stabilization.

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

Slope stabilization with mesh

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

Installation of a rockfall barrier at night - work is carried out around the clock.

비탈면 보강 시스템 - Rebuilding the Ahrtal 2025

Installation of a multi-part rockfall barrier along a steep rock face.

 
 

설치 년도

2025

Situation

In July 2021, the Ahrtal (Germany) was hit by one of the worst flood disasters in Germany. The railroad line running through the valley was almost destroyed. Almost four years later, not everything has been restored, but reconstruction is making visible progress. The line should be back in operation in 2025.

Description

To protect the rebuilt railway line from rockfall, thirteen rockfall barriers with a total length of 570 meters have been installed along the route over the past few months.

In addition, approximately 18,000 m² of embankment areas have been netted and secured. Eight more rockfall barriers with an additional length of 590 meters and around 7,000 m² of additional netting will follow before the line is scheduled for operation at the end of the year.

The rockfall protection (RXE-2000) gallery installed in the Altenahr station area, directly above the new platform, is a central element.

Work is carried out in shifts to complete this construction project on schedule, sometimes around the clock. 

Country/Region

독일

Contractor

Protected object

Road, Railway, Building

부식방지

GEOBRUGG SUPERCOATING

Your local contact

Saleh Feidi
 

Saleh Feidi

Regional Manager California

자연 재해
충격 보호
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 미국 Regional Manager California

이메일

Bryant Jackson
 

Bryant Jackson

자연 재해
충격 보호
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 미국

이메일

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

자연 재해
충격 보호
Geobrugg North America, LLC,KS 67226 Wichita / 미국 Regional Manager Rocky Mountains / Central USA

이메일

Robert Long
 

Robert Long

Regional Sales Manager Southeast

자연 재해
충격 보호
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 미국 Regional Sales Manager Southeast

이메일

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

자연 재해
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

이메일

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

자연 재해
충격 보호
Geobrugg North America, LLC,OR 97302 Salem / 미국 Regional Sales Manager Pacific Northwest and Hawaii

이메일