Moloz akışına ve heyelana karşı koruma - Lienzerbach 2019

The upper debris flow protection net

Moloz akışına ve heyelana karşı koruma - Lienzerbach 2019

Drilling work with a walking excavator at the lower net

Moloz akışına ve heyelana karşı koruma - Lienzerbach 2019

Assembly work with the support of a walking excavator

Moloz akışına ve heyelana karşı koruma - Lienzerbach 2019

The lower debris flow protection

Moloz akışına ve heyelana karşı koruma - Lienzerbach 2019

Both debris flow protection networks and the access road

 

Sistemler

 

Sistem uzunluğu

15 m - 16 m

 

Kurulum Yılı

2019

Durum

In Lienz/Altstätten in the Swiss Rhine Valley, about 50 buildings are at risk from floods and debris flow.
A bedload study showed that smaller debris flows above the Roti Platte area (starting area of the debris flows) can detach in the gullies, which can grow into a larger debris flow in the Roti Platte area. They can mobilize up to 10,000 m³ of additional material between the Roti Platte area and the Furnis barriers.

Açıklama

The construction project comprises two staggered net barriers (VX160-H6) in the Roti Platte area with a retention volume of approx. 1600 m³. These net barriers, which are planned as transitional measures until the expansion project further downstream, are intended to interrupt the growth of a debris flow and to increase the protection of the village of Lienz.

Müşteri

Gösterilen obje

Building, Residential area

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta