myGeobrugg
2018
As a prevention from falling blocks, several sectors had to be stabilized.
TECCO® G65/3 was installed in different sectors under different conditions:
- an abandoned quarry
- at an inclination greater than 70 % of the project
- in some sectors on a concrete surface
- on vegetation
This mesh stabilization system is designed for a maintenance-free solution throughout the life of the project.
Rockfall project Ciudad Bolivar (1)
https://www.geobrugg.com/en-Ciudad-Bolivar,-Cable-Car-(1)
Union Temporal Cable Aereo
Building, Residential area
Kaya düşmesine karşı koruma