США
США

myGeobrugg

Камнепады, обвалы, осыпи - La Robla, León 2020

8 m high posts for this 8'000 kJ rockfall barrier

Камнепады, обвалы, осыпи - La Robla, León 2020

The situation: rockface on top, slope, railtrack and road

Камнепады, обвалы, осыпи - La Robla, León 2020

This rock of about 50 t even "jumped" over the railtrack

Камнепады, обвалы, осыпи - La Robla, León 2020

During installation; the rockfall drape is visible in the background

Камнепады, обвалы, осыпи - La Robla, León 2020

Ringnet with secondary mesh

Камнепады, обвалы, осыпи - La Robla, León 2020

Completed rockfall barrier, drape above in the background

 

Длина системы

150 m

 

Год установки

2020

Ситуация

The heavy rains of December 2019 affected the railway platform of Line 130 Venta de Baños-Gijón, Section: La Robla and La Pola de Gordón. The rail track's major damage was at km 26/700, where large rocks fell from the rock face above. The rock face is about 45 meters high; boulders came down the slope underneath - about 300 m to the railway platform. One of these rocks of approximately 50 t went over the track. It only stopped at the edge of Puente de Alba's main street (León). Several other rocks, weighing just under 10 tons, also came down next to the track. For this reason, Spanish railway administrator ADIF decided to install a dynamic barrier and a rock guidance system to protect the users of this heavily frequented railway line.

Описание

A dynamic barrier RXE-8000, 8 m high and 150 m long, was installed. This barrier is certified according to EAD EAD-340059-00-0106-2018 and therefore has European Technical Assessment and CE marking. Also, it is certified according to Swiss regulations.

In addition, 6,800 m² of TECCO® G65/3 high yield strength steel wire mesh was installed as a rock guide curtain. The mesh is certified according to EAD-230025-00-0106 and is CE marked.

RXE-8000: Energy absorption capacity: 8,000 kJ, system height: 8 m, system length: 150 m
TECCO® Drape: Slope height: 45 m, slope inclination: 80°, exposure: Southwest

Защищаемый объект

Железнодорожная линия

Защита от коррозии

GEOBRUGG SUPERCOATING

Представитель в Вашем регионе

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / США Regional Manager Northeast

Электронная почта

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / США Regional Manager California

Электронная почта

John Kalejta
 

John Kalejta

Regional Manager Central US

Инженерная защита
Гидротехника
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / США Regional Manager Central US

Электронная почта

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Инженерная защита
Гидротехника
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / США Regional Manager Southeast

Электронная почта

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Инженерная защита
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

Электронная почта

Tim Shevlin
 

Tim Shevlin

Sales Director

Инженерная защита
Geobrugg North America, LLC,Salem OR 97302 / США Sales Director

Электронная почта