Viaduc du rocher de Larce - RN5

Protezione da caduta massi - Viaduc du rocher de Larce - RN5 2024

Excellent visual integration of the protection system with 5,000 m² mesh

Protezione da caduta massi - Viaduc du rocher de Larce - RN5 2024

The system's adaptability means that posts can be positioned on ridges with center-to-center distances of up to 16 m, reducing the number of posts and anchors required

Protezione da caduta massi - Viaduc du rocher de Larce - RN5 2024

5,000 m² of protection with excellent visual integration of the system. Thanks to the use of high-tensile steel wire mesh, the number of posts could be reduced, and energy dissipators were not necessary.

 

Sistemi

 

Lunghezza del sistema

65 m - 100 m

 

Anno di installazione

2024

Situazione iniziale

The Morez Viaduct on the RN5 runs for several hundred meters along the Larce rock face. This predominantly rocky slope produces numerous boulder and rock fall events, which are currently channeled and accumulated in aging structures that are inadequate for the phenomena involved (mesh barriers, rope ladders, etc.).

Descrizione

Geobrugg supplied a rockfall attenuator that met several criteria. A study of the area's rockfall hazards provided the input data allowing the use of the ATTERO dimensioning software.

Thanks to the solution’s adaptability and low visual impact, it is perfectly integrated into the viaduct. This attenuator’s optimized composition, with no energy dissipation system (brake), will minimize the need for maintenance intervention.

Paese / Regione

Francia

Cliente

Direction Interdépartementale des Routes (DIR) EST

Progettazione:

Géolithe

Contraente:

NGE Fondations

Oggetto protetto

Strada

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

René Müller
   

René Müller

Country Manager Western Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Sistema di monitoraggio da remoto
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera Country Manager Southern Switzerland

E-mail