Svizzera
Svizzera

myGeobrugg

Trek route to Shri Mata Vaishno Devi Shrine (2)

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

TECCO® SYSTEM³ and TECMAT® anti-erosion mat after installation and greening

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Target of all pilgrims - famous Holy Shrine of Shri Mata Vaishno Devi

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Scenic route to the Holy Shrine of Shri Mata Vaishno Devi - originally protected with simple canopies

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Rockfalls were quite eminent and the are for sure required extra safety measures

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

QUAROX® with DELTAX® secondary mesh (also called QUAROX® PLUS) installation in progress

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Unrolling of QUAROX® high tensile net on the slope

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Nail drilling works in progress - for extra safety reasons, all the works were implemented through previously unrolled QUAROX® high tensile net

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

Together with active slope stabilization also many rockfall barriers were installed - here visible GBE-3000A type for 3000 kJ

Consolidamento di versanti - Trek route to Shri Mata Vaishno Devi Shrine (2) 2016

TECCO® SYSTEM³ and TECMAT® anti-erosion mat after installation and greening

 

Anno di installazione

2016

Situazione iniziale

There had been several cases of rockfall and landslides in the trek route of the Holy Shrine of Mata Vaishno Devi. Therefore, the Shrine Board decided to actively stabilize the 75º and higher steep slope, up to a maximum height of 70 m in this section. A protective measure had to be selected to stabilize the exposed cutting against superficial instabilities, tilting as well as sliding of individual blocks and rockfalls.

Descrizione

The flexible slope stabilization system consists of TECCO® G65/3 high-tensile steel wire mesh and QUAROX® rolled cable net, system spike plates and soil nails has been selected. Spike plates which match the load capacity of the mesh serve to fix the mesh to soil or rock nails. By tensioning these nails, and recessing the spike plates into the ground, the mesh is adequately tensioned to ensure it follows the surface contours.

Based on the survey results, the authorities also decided to apply a rockfall protection barriers from Geobrugg. With its ring nets made of high-tensile steel wire the barrier design has been tested and approved to absorb impact energies of up to 8000 kJ. A total number of 15 barriers were installed in different locations with energy absorption capacity ranging from 3000 kJ up to 8'000 kJ.

See also our rockfall project Trek route to Shri Mata Vaishno Devi Shrine (1)

Cliente

Shri Mata Vaishno Devi Shrine Board

Contraente:

Pioneer Foundation Engineers Pvt Ltd.

Oggetto protetto

Strada, Costruzione, Infrastrutture turistiche, Infrastrutture, Architettura, Altri

Protezione dalla corrosione

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Progettazione:

Tehri Hydro Development Corporation Ltd.

Altre applicazioni installate

Protezione da caduta massi

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail