GEOHAZARD - FOLLOW US

Lingua
Italianoit
Stati Uniti
myGeobrugg

Registrazione

Non avete un codice d'accesso e desiderate registrarvi?

In quanto utente registrato Geobrugg puoi scaricare file e accedere ai nostri strumenti di quotatura e agli nostri eventi.

Registra ora
A BRUGG GROUP COMPANY
Stati Uniti

Schwieberdingen

Holdergasse 24 - 28, 71701, Schwieberdingen, Germania
2016
Cliente
Private
Progettazione:
Henke und Partner GmbH, Ingenieurbüro für Geotechnik
Contraente:
Bramm Bau GmbH
Oggetto protetto
Costruzione, Cava / Miniera
Protezione dalla corrosione
GEOBRUGG SUPERCOATING®
Area stabilizzata
700 m²
Altezza versante
40 m
Inclinazione versante
30 ° - 90 °
Esposizione
Sud-ovest
Altre applicazioni installate
Miniera / Gallerie
Situazione iniziale

The apartment house Holdergasse, in Schwieberdingen (near Stuttgart) was built in a former stone quarry in the second half of the 20th century.  At that time, the stone walls were in a good condition.  The first rockfalls occurred some years ago, caused by weather conditions. Extremely loud impacts from rocks concerned the residents.

An initial assessment by the Henke and Partner in Stuttgart, showed that a full area support was necessary.  At the customer’s request, different measurements were evaluated. The comprehensive search for suitable solutions took about two years.  The solution proposed by Henke and Partner including TECCO® SYSTEM³, proved to be the most logical and economical application.

Geologia

Shell limestone

Descrizione

The rock wall was divided into various areas of protection such as steep rock faces, overhanging formations, layered rocks with covered with with loose soils . Due to the tightness in some areas between the building and the rock face, a suitable solution had to be found here as well.

According to the dimensioning using RUVOLUM® software high tensile steel mesh type TECCO® 65/2 proved to be the most economical solution.

In some areas with overhangs, shotcrete filling had to be planned. The areas with loose rock were additionally covered with the anti-erosion protection mat TECMAT®. Areas where the distance to the building was less than one meter, extra lacing was implemented.
After completion, the initially skeptical residents were enthusiastic about the good adaptation to the terrain. The work was carried out by the company Bramm Bau GmbH.

Il contatto locale

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / Stati Uniti d'America
Telefono +1 860 377 3230

modulo di contatto

Saleh Feidi
Saleh Feidi
Regional Manager California
Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / Stati Uniti d'America
Telefono +1 909 706 8964

modulo di contatto

John Kalejta
John Kalejta
Regional Manager Central US
Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / Stati Uniti d'America
Telefono +1 505 220 1404

modulo di contatto

Bob Lyne
Bob Lyne
Regional Manager Southeast
Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / Stati Uniti d'America
Telefono +1 336 337 0945

modulo di contatto

Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC
22 Centro Algodones
Telefono +1 505 771 4080
Mobile +1 505 400 0796

modulo di contatto

Tim Shevlin
Tim Shevlin
Sales Director
Sistemi contro il dissesto idrogeologico
Geobrugg North America, LLC
4676 Commercial St. SE, PMB 174
Salem OR 97302 / Stati Uniti d'America
Telefono +1 503 423 7258

modulo di contatto