Svizzera
Svizzera

myGeobrugg

Kaikoura Coastal Pacific Rail (SH1)

Protezione contro frane e colate detritiche - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking West - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ring net tail - note proximity to rail

Protezione contro frane e colate detritiche - Kaikoura Coastal Pacific Rail (SH1) 2019

Looking North - VX080-H4 debris flow barrier with 12/3/350 ROCCO® ringnet tail - note proximity to rail

Protezione contro frane e colate detritiche - Kaikoura Coastal Pacific Rail (SH1) 2019

VX080-H4 - debris accumulation as per design in the catchment ditch after moderate rain

Protezione contro frane e colate detritiche - Kaikoura Coastal Pacific Rail (SH1) 2019

Debris flow barrier to ROCCO® tail connection

Protezione contro frane e colate detritiche - Kaikoura Coastal Pacific Rail (SH1) 2019

Drape Support ropes to assist lower engery material to pass through

 

Sistemi

VX VX080-H4 Soluzioni speciali

 

Anno di installazione

2019

Situazione iniziale

The 2016 Kaikoura M7.8 earthquake caused widespread damage to the road and rail corridor some 20 km North and South of the Kaikoura township. Over 40 major slips inundated the road and rail with over 750'000 m³ of material from source zones up to 500 m above sea level. The highly fractured Grey Wacke means frequent future rockfalls and debris loads are to be expected. The high rockfall and debris load frequency created the requirement for a Geohazard Solution that attenuated the energy to a manageable level and guided the material down to a catchment area. Due to the proximity of the Coastal Pacific rail line space is limited.

Descrizione

A VX080-H4  debris flow barrier was combined with a 12/3/350 ROCCO ring net tail. This system enables the rockfall and debris energy to be attenuated and guided down to a catchment area at the toe of the slope for easier clearing and reduced maintenance. Additional support ropes were also installed across the channel under the ROCCO® tail where it rested on the slope to enable the lower energy material to pass under and not get caught up. Short 0.5 m tethers were installed in the lower part of the tail to stop it from kicking out towards the rail in the larger energy events. TECCO® G65/3 was used as a secondary mesh as a robust solution was required due to the high frequency of the smaller high-velocity rocks.
Shortly after completion, the system demonstrated itself to be working well.

Paese / Regione

Nuova Zelanda

Cliente

KiwiRail

Contraente:

Geovert

Oggetto protetto

Ferrovia

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

René Müller
   

René Müller

Country Manager Western Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Western Switzerland

E-mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera , Msc. Env. Eng.

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Sistema di monitoraggio da remoto
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Svizzera Country Manager Southern Switzerland

E-mail