myGeobrugg
2014
The North Carolina Department of Transportation had to widen Howard Gap Road by carving into an adjacent hillside. The slope had to be stabilized in order to do so.
Loose, unstable soil slope
The contractor selected Geobrugg’s anchored TECCO® System to stabilize the slope, thereby eliminating the potential for hazard to the public.
Details:
Also read Forester Media in 2019 on this and other slope stabilizations.
Stati Uniti
North Carolina Department of Transportation
Wurster Engineering and Construction
Wurster Engineering and Construction, Rich Adams
Strada
GEOBRUGG SUPERCOATING