Cacheuta Tunnel - Mendoza - Road N°82

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

General view of the stabilized slope: TECCO® G65/3 system and the 4 meters high dynamic barrier RXE-500

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

Drilling for the anchors (3.5 meters deep holes)

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

Installing the mesh at the prepared slope

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

In this section Rolled Cable Net QUAROX® and DELTAX® are installed

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

TECCO® system stabilizing the rockface

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

Assembly of the 4 meters high and 52 meters long rockfall barrier RXE-500

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

Completed RXE-500 rockfall barrier

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

View up the rockface - RXE-500 rockfall barrier

Kaya düşmesine karşı koruma - Cacheuta Tunnel - Mendoza - Road N°82 2020

Debris flow protection ring net VX060L, 4 meters high, 10 meters long

 

Sistem uzunluğu

10 m - 52 m

 

Kurulum Yılı

2020

Durum

In a section of Route 82, near the entrance of the Cacheuta tunnel N°1, rocks frequently fell on the road. These and landslides represented a danger for the traffic.

Açıklama

Several systems of protection against rockfall and debris flow, as well as slope stabilization, were implemented.

Installed systems per section:
1a)  RXE-500: 4 meters high and 31 meters long
1b)  VX-060L: 4 meters high and 10 meters long
2)  RXE-500: 4 meters high and 24 meters long
3)  RXE-500 :4 meters high and 42 meters long

4)  972 m² Rolled Cable Net QUAROX® Plus DELTAX®
     774 m² TECCO® G65/3 grid 2x2
     847 m² DELTAX® G80/2

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Kurulan diğer uygulamalar

Kaya düşmesine karşı koruma, Şev ve Yamaç koruma, Moloz akışına ve heyelana karşı koruma

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta