Швейцария
Швейцария

myGeobrugg

Камнепады, обвалы, осыпи - Valley of Tempe 2010

Overview of the construction site showing the importance for the protection measures

Камнепады, обвалы, осыпи - Valley of Tempe 2010

Fatal accident in the Valley of Tempe, main trigger for the further installed measures

Камнепады, обвалы, осыпи - Valley of Tempe 2010

Another rockfall accident in the Valley of Tempe

Камнепады, обвалы, осыпи - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road

Камнепады, обвалы, осыпи - Valley of Tempe 2010

SPIDER®-System installation on the rockface directly next to the road. Rockface is actively stabilized

Камнепады, обвалы, осыпи - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) and below road destroyed by rockfall

Камнепады, обвалы, осыпи - Valley of Tempe 2010

Road protected with RX-300 rockfall barrier (for 3000 kJ) - below visible road reconstruction works

Камнепады, обвалы, осыпи - Valley of Tempe 2010

RX-300 rockfall barrier (for 3000 kJ) installation works

Камнепады, обвалы, осыпи - Valley of Tempe 2010

Road view just after all works implementation

 

Длина системы

50 m - 300 m

 

Год установки

2010

Ситуация

Témpi (also Tembi / Tembe / Τέμπη) Valley is the last remaining bottleneck along the Athens - Thessaloniki Motorway.  20,000 cars  pass by the eight kilometer long gorge each day. After two consecutive fatal rockfall events, the Agean Motorway SA closed the road in agreement with the ministry of street.

Описание

Olympia Joint Venture signed a contract with Geobrugg to execute emergency rockfall mitigation measures with the aim to re-open the road for two weeks during Easter time. The remaing part of the work was to be completed by the end of May 2010.  In order to meet the deadline, 30 workers, six boomlifts, two truck cranes, six compressors and a helicopter were necessary.

Dangerous rock slopes were actively stabilized using TECCO® SYSTEM³ and SPIDER®.  A series of rockfall barriers were installed along the road.

Клиент

Olympia Joint Venture (Aktor – Hochtief)

Подрядчик

Olympia Joint Venture (Aktor - Hochtief)

Защищаемый объект

Дорога

Защита от коррозии

Оцинковка, GEOBRUGG SUPERCOATING

Проектировщик

Omikron Kappa Consulting S.A.

Dahil olan diğer şirketler

Crestageo AG, Geobrugg Italia Srl, Geobrugg Ibérica & Morocco S.A.U.

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта