Consolidamento di versanti - Schmerikon State Road 17 2013

Bird's eye view of the protected objects: State roadway, railway, bicycle path, building and port

Consolidamento di versanti - Schmerikon State Road 17 2013

Slope failure seen shortly after the emergency work began a few days after the incident in June 2013

Consolidamento di versanti - Schmerikon State Road 17 2013

Spider excavator during drilling

Consolidamento di versanti - Schmerikon State Road 17 2013

Drilling along the top edge of the failed slope

Consolidamento di versanti - Schmerikon State Road 17 2013

Drilling with manual equipment

Consolidamento di versanti - Schmerikon State Road 17 2013

View of the upper section showing nailed TECCO G65/3, P33 spike plates and border rope

Consolidamento di versanti - Schmerikon State Road 17 2013

Location: Zürichsee, Switzerland Federal Office of Topography, Bern, Switzerland National Map 1:50'000

 
 

Anno di installazione

2013

Situazione iniziale

In the first days of June 2013 heavy storms and intense rainfall hit the region of the upper lake of Zurich. Due to saturation of the ground and instable geological conditions, a landslide buried a long section of heavily travelled commuter roadway and railway along the lake. This landslide caused complete closure of the infrastructure.

Geologia

Top Section: weathered marl

Bottom section: weathered sandstone / siltstone

Descrizione

The department for underground construction initiated re-establishment and sustainable prevention of future similar incidents a few days later. To reach a quick decision and accelerate the construction, the department quickly involved local and regional partners.

Solutions discussed were rockfall barrier, manifold, or anchored TECCO® System the most favorable and ultimately chosen solution.

The upper slope section (marl) was protected and stabilized using a nailed mesh. The lower sandstone/siltstone section was covered with a drape to ensure that falling debris is kept close to the slope while being guided and deposited to the ditch.

Cliente

State Department for Underground Engenieering, Canton St.Gallen

Contraente:

Oberholzer Bauleistungen Inc., Neuhaus, Switzerland

Oggetto protetto

Strada, Ferrovia, Infrastrutture

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Progettazione:

Dr. A. Gübeli AG, Jona, Switzerland

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail