Svizzera
Svizzera

myGeobrugg

Consolidamento di versanti - Cockermouth Castle 2016

First summer after project completion showing first signs of re-vegetation

Consolidamento di versanti - Cockermouth Castle 2016

Cockermouth Castle slope after restoration works using TECCO® G45/2 mesh, system spike plates type P25 and nailing

Consolidamento di versanti - Cockermouth Castle 2016

Overview of the slope failure directly endangering the Cockermouth Castle

Consolidamento di versanti - Cockermouth Castle 2016

Part way through the installation of the TECCO® SYSTEM³. The smallest part of the failure is visible on the right

Consolidamento di versanti - Cockermouth Castle 2016

Close up of the completed solution - visible fine but lightweight structure of the high tensile steel mesh TECCO® G45/2

 
 

Anno di installazione

2016

Situazione iniziale

Following heavy storms and flooding in 2015 significant erosion was caused to the riverbank under the castle.

Geologia

Quaternary fluvial sands.

Descrizione

In conjunction with the geotechnical contractor, who had already decided the slope needed soil nailing and TECCO® System, we looked to optimise the solution for the fine grained nature of the soil. We suggested the use of the TECCO® G45/2 in conjunction with an erosion control mat.

Cliente

Cockermouth Castle

Contraente:

CAN Geotechnical

Oggetto protetto

Infrastrutture turistiche, Altri

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Country Manager Ost- und Zentralschweiz, Liechtenstein

E-mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG,Industriestrasse 21,5200 Brugg / Svizzera Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Sistemi contro il dissesto idrogeologico
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Svizzera Project Manager Inspection Services

E-mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Sistemi contro il dissesto idrogeologico
Ingegneria idraulica
Miniera / Gallerie
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Svizzera Ticino Country Manager

E-mail