İsviçre
İsviçre

myGeobrugg

Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

TECCO® SYSTEM³ after installation - slope is fully protected

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Overview of the construction site

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Slope cut at km 147+020 showing the geology conditions of the construction site

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Extremely weathered ground conditions at km 147+780 before stabilization works

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Installation works in progress at km 147+780 - slope is already particularly stabilized with TECCO® SYSTEM³

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Installation and drilling works in progress, at the slope angle of 75°

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Laying of TECCO® G65/3 mesh under the supervision of Geobrugg specialist

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Slope covered with TECCO® G65/3 mesh along with MultiMat 030 to support further vegetation

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

Closer look at the slope completely stabilized with TECCO® SYSTEM³ - visible mesh pretensioning effect, minimizing further deformations

Şev ve Yamaç koruma - Kiratpur-Ner Chowk National Highway-21, Punjab & Himachal Pradesh 2015

TECCO® G65/3 mesh together with anti-erosion Tenax Multimat 030 after installation completion

 

Sistemler

 

Kurulum Yılı

2015

Durum

A total of 8 different chainage locations with a cumulative area of approximately 50000 m² of slopes required stabilization. The client required an active slope stabilization system with greening which should look aesthetically appealing. This project is a part of the project 4-Laning of Kiratpur-NerChowk section of National Highway-21 (from km 21.55 to km 154.00) in the state of Punjab & Himachal Pradesh.

Açıklama

TECCO® SYSTEM³ was nailed by fully threaded rock-bolts, with minimum dia of 28 mm to a maximum of 40 mm and hot-dip galvanized. The nail pattern was variable with 1.9 x 1.9 m to a maximum of 2.4 x 2.4 m at different chainage points. The installation was carried out by trained professionals having expertise in drilling and civil work, under the expert supervision of Geobrugg India Pvt. Ltd. to ensure maximum safety with correct methodology also guiding the site engineers and sub-contractors for optimum effects and results.

Müşteri

IL&FS Engineering & Construction Company Ltd.

Yüklenici

M/s Pioneer Foundations Engineers, M/s Sai Gr Impex Pvt. Ltd., M/s Afond Construction Pvt. Ltd.

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

ITNL & Grusamar Ltd.

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta