İsviçre
İsviçre

myGeobrugg

Gföller Brücke, Val d’Ega

Kaya düşmesine karşı koruma - Gföller Brücke, Val d’Ega 2014

Overview over the Gföller-Bridge with extra latticework, the ROCKFALL-X G system on top and the rockface in the background

Kaya düşmesine karşı koruma - Gföller Brücke, Val d’Ega 2014

Moving of the ROCKFALL-X G damping modules using a crane

Kaya düşmesine karşı koruma - Gföller Brücke, Val d’Ega 2014

Bags of various heights of 1.0 m, 1.5 m and 2.0 m during installation - visible height dependent arrangement

Kaya düşmesine karşı koruma - Gföller Brücke, Val d’Ega 2014

Eventual empty spaces are fiiled with cellular glass in order to prevent any unnecessary movements

Kaya düşmesine karşı koruma - Gföller Brücke, Val d’Ega 2014

A layer of topsoil, with a lining of erosion-resistant jute sheet, was installed over the ROCKFALL-X G damping modules and then hydroseeded. Visible final solution appearance

 

Sistemler

 

Sistem uzunluğu

20 m - 40 m

 

Kurulum Yılı

2014

Durum

The gallery between two stretches of tunnels is exposed to rockfall. The concrete deck risked to be damaged by severe events.

Açıklama

To secure the bridge from rockfall energies up to 2300 kJ, a gallery roof construction was built above the street-stretch between the two tunnels. To reduce the risk further, the gallery-roof was secured by the ROCKFALL-X G damping system. A protection system which works by absorbing kinetic energy, thereby limiting deformation and above all limiting the pressure exerted on the deck by spreading loads over a wide area, while limiting the weight on the gallery so as not to overburden it.

556 preassembled ROCKFALL-X G big bags were delivered and installed during May and June 2014 in the following configuration:

  • 109 pcs. - 1.0 m high
  • 99 pcs. - 1.5 m high
  • 348 pcs - 2.0 m high

Müşteri

Provinz Bozen

Yüklenici

Max Bögl

Gösterilen obje

Road

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

PPS Group, Bozen

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta