At the cut where the pressure pipe descends to the Mendre I hydroelectric plant, a block of rock threated the power plant.
Basalts.
Geobrugg specialists used the RUVOLUM software for the design and applied SPIDER® System to stabilize the blocks around the pipeline. Rock nails GEWI 28 mm were used to fix the net.
Caldera Energy Corp.
IDM Ingenieria y Construcción S.A.