İsviçre
İsviçre

myGeobrugg

Imogiri Royal Cemetery, Yogyakarta

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

A few weeks after installation, in January 2021, the stabilizing mesh has become invisible, the slope looks natural - protection of the local villagers and go-green aspect.

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Initial condition of the slope, before clearing

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

The Sugengan, a traditional Royal Yogyakarta ceremony for initiating the project

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

The slope after clearing

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Drilling soil nails

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Grouting

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the mesh rolls - they do roll!

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Installation of the spike plates and tightening the nuts using a torque wrench

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

Completed installation in December 2020; re-vegetation has already started

Şev ve Yamaç koruma - Imogiri Royal Cemetery, Yogyakarta 2020

The stabilized slope end of February with a very natural look.

 

Sistemler

 

Kurulum Yılı

2020

Durum

On the north slope of Imogiri hill, a considerable risk potential had to be faced. Slope failures can cause damages to the Imogiri Royal Cemetery on the top of the hill. Also, they threaten villagers who live and work at the hill’s toe.

Jeoloji

Weathered rock and andesite

Açıklama

For stabilization system with steel wire mesh was installed to stabilize the slope. The system is proven, efficient, and reliable. It has little visible impact and respects ecological aspects.

Müşteri

Kraton Yogyakarta

Yüklenici

PT. Triputri Sukses Mandiri

Gösterilen obje

Building, Infrastructure, Sanat

Korozyon koruması

GEOBRUGG SUPERCOATING

Mühendislik

PT. Tri Patra Konsultan (designer), PT. Cipta Adi Tama (supervisor)

Yerel yetkiliniz

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Country Manager Ost- und Zentralschweiz, Liechtenstein

e-posta

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / İsviçre Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

e-posta

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / İsviçre Project Manager Inspection Services

e-posta

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hidrolik mühendisliği
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / İsviçre Ticino Country Manager

e-posta