Швейцария
Швейцария

myGeobrugg

Укрепление склонов - Lyme Regis 2014

View from West looking East two months after slope works completed

Укрепление склонов - Lyme Regis 2014

Early stage of the works. Prior to mesh installation

Укрепление склонов - Lyme Regis 2014

Torque applied to spike plate and soil nail

Укрепление склонов - Lyme Regis 2014

Abseiling whilst unrolling TECCO® G65/3 mesh

Укрепление склонов - Lyme Regis 2014

View down slope showing irregular slope angles and topography

Укрепление склонов - Lyme Regis 2014

View to West extent of work site.

Укрепление склонов - Lyme Regis 2014

Vertical seams being joined with TECCO® T3 connection clips

Укрепление склонов - Lyme Regis 2014

View looking East across the full slope works

 

Системы

 

Год установки

2014

Ситуация

An area of Special Scientific Interest and part of the World Heritage Jurrasic coast was under threat from movement along a historic landslide. This put 240 houses under threat and over 900 metres of main road network.

Rеология

Blue Lias overlayed with Shales With Beef ('beef' is the local name given to jagged layers of limestone that occur between the shales); Black ven marls 

Описание

Soil Nail design was completed by AECOM as part of this process a flexible facing was required. Through close communication with the design team and contractor CAN we were able to specify the use of TECCO® mesh G65/3. After careful consideration of the local environment, it was decided to use the improved galvanizing of ULTRACOATING to increase the lifespan of the TECCO® mesh on site.

A vertical nail spacing of 1 metre and horizontal of 2 metres was required for control of the global stability. Using various drill rigs, soil nails have been drilled to depths of 18 metres at an angle of 25 degrees below horizontal. At each soil nail head, the ground has been recessed slightly to allow for the large plate to be installed. This also allows for good tensioning of the TECCO® mesh.

Клиент

West Dorset District Council

Подрядчик

CAN Geotechnical

Защищаемый объект

Дорога, Строительство, Туристическая инфраструктура, Жилой район, Другое

Защита от коррозии

GEOBRUGG ULTRACOATING

Проектировщик

AECOM

Представитель в Вашем регионе

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Country Manager Ost- und Zentralschweiz, Liechtenstein

Электронная почта

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Геобругг АГ,Industriestrasse 21,5200 Brugg / Швейцария Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Электронная почта

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Инженерная защита
Геобругг АГ,Аахштрассе 11,8590 Романсхорн / Швейцария Project Manager Inspection Services

Электронная почта

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Инженерная защита
Гидротехника
Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Швейцария Ticino Country Manager

Электронная почта