美国
美国

myGeobrugg

边坡稳定 - Wrabness 2022

Final installation of the stabilising mesh and the erosion control mat

边坡稳定 - Wrabness 2022

Final installation for slope stabilisation

边坡稳定 - Wrabness 2022

Stabilised railway embankment in Wrabness

 
 

安装年份

2022

情况

Following slope instability alongside the railway line in Wrabness, a design to stabilise the slope was put forward using soil nails in combination with Geobrugg GREENAX mesh.

地質學

Geology of the bedrock was made up of the Thames Group, comprising weak sands, clays and siltstones with areas of overlying alluvium and sands and gravel deposits

描述

The situation used a practical solution of combining the mesh and nailing solution, with burying the top and bottom of the mesh in trenches at the top and bottom of the railway.

The mesh and nails needed to work around a king post wall were also installed as part of the works.

国家/地区

英国

客户

Universal Piling and Geotechnical

防护对象

Railway

腐蚀保护

GEOBRUGG ULTRACOATING

本地联系方式

Saleh Feidi
 

Saleh Feidi

自然災害防護
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

Bryant Jackson
 

Bryant Jackson

自然災害防護
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 美国

联系地址

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / 美国 Regional Manager Rocky Mountains / Central USA

联系地址

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 美国 Regional Sales Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Impact Protection
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / 美国

联系地址