美国
美国

myGeobrugg

边坡稳定 - Tunnel de Revenez 2016

SPIDER® S3-130 protecting the railway line between Martigny, Switzerland, and Chamonix, France, together with the road to Finhaut, providing a perfect big block stabilization

边坡稳定 - Tunnel de Revenez 2016

Portal of the Tunnel de Revenez - on the left a big amount of scree removed from the railway line

边坡稳定 - Tunnel de Revenez 2016

The site before installation with its steep rock slope directly next to the railway line

边坡稳定 - Tunnel de Revenez 2016

Situation before the stabilization with SPIDER® S3-130 - large loose blocks are endangering the infrastructure below

边坡稳定 - Tunnel de Revenez 2016

Overview before protection measures were implemented

边坡稳定 - Tunnel de Revenez 2016

High tensile SPIDER® S3-130 net was unrolled on the slope before drilling works began. Thus during the top-down drilling the safety of the construction crew was ensured

边坡稳定 - Tunnel de Revenez 2016

To provide optimal blocks stabilization and SPIDER® S3-130 net pre-tensioning, GEWI 32 nails were installed in the dells - where possible

边坡稳定 - Tunnel de Revenez 2016

Detail of the slope stabilization SPIDER® S3-130 net fixed with GEWI 32 nails, border rope and system spike plate P33/40

边坡稳定 - Tunnel de Revenez 2016

At the crest above the stabilized slope, an extra RXE-500 rockfall barrier line was installed to provide extra protection against rockfalls from upper areas

边坡稳定 - Tunnel de Revenez 2016

The RXE-500 rockfall barrier installed directly above the stabilized slope

边坡稳定 - Tunnel de Revenez 2016

SPIDER® S3-130 protecting the railway line and the road, providing perfect stabilzation of the large blocks

 

安装年份

2016

情况

Directly next to the Tunnel de Revenez is a very steep slope made of large, loose rock blocks which endangered the railway line lying directly below.

地質學

Gneiss

描述

To protect the railway line, Martigny-Châtelard and the road lying next to it, 650 m² of SPIDER® S3-130 was installed.  Also installed, was a 3 m high, 24 m long, RXE-500 rockfall barrier.

客户

Commune de Finhaut

承包商

ABA Bautec AG

防护对象

Road, Railway

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Silvaplus SA

其他安装的应用程序

落石防护

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址