瑞士
瑞士

myGeobrugg

边坡稳定 - Tunel Kloštar 2015

Tunnel Klostar portal and slopes around in the final state after stabilization.

边坡稳定 - Tunel Kloštar 2015

Drilling works on the slope directly next to the tunnel portal.

边坡稳定 - Tunel Kloštar 2015

Drilling works and installation of nails on the tunnel portal.

边坡稳定 - Tunel Kloštar 2015

Tunnel portal protected with TECCO® SYSTEM3.

边坡稳定 - Tunel Kloštar 2015

TECCO® SYSTEM3 on the slope.

边坡稳定 - Tunel Kloštar 2015

.

边坡稳定 - Tunel Kloštar 2015

.

边坡稳定 - Tunel Kloštar 2015

.

边坡稳定 - Tunel Kloštar 2015

.

边坡稳定 - Tunel Kloštar 2015

Tunnel portal after completion of all installation works.

 

安装年份

2015

情况

Rockfalls on a speed up railway line near tunnel Kloštar.

地質學

Limestone.

描述

Active slope protection and tunnel portal with nailed DELTAX® mesh and TECCO® System

客户

Hrvatske željeznice

承包商

Octopus Rijeka

防护对象

Railway

腐蚀保护

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

工程

Geotehnički studio Zagreb

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址