美国
美国

myGeobrugg

Sipplingen cycle path and road B31

边坡稳定 - Sipplingen cycle path and road B31 2016

Overview of the slope and adjacent infrastructure after nailing and TECCO® SYSTEM³ stabilization works

边坡稳定 - Sipplingen cycle path and road B31 2016

Slope failure causing huge transport infrastructure interruption

边坡稳定 - Sipplingen cycle path and road B31 2016

Landslide area after the removal of failed material

边坡稳定 - Sipplingen cycle path and road B31 2016

Drilling of the soil nails - visible temporary wooden wall which allowed to have the road open

边坡稳定 - Sipplingen cycle path and road B31 2016

Slope stabilized with nailing and TECCO® SYSTEM3 as a protection of cycling path, federal road and railway line

 
 

安装年份

2016

情况

Ludwigshafen and Sipplingen at the Lake Constance are connected by a railway line, the federal road B31 and a cycle path. At the narrowest points the slope was cut and stabilized by a retaining wall for the bike path. In May 2016 the slope above failed. In the area of the retaining wall, movements in the embankment occurred in 2006 and 2012. In addition, in the years 2013 and 2015 further landslides occurred at the north-west end.

地質學

Siltstones, sandstones and marlstones

描述

Due to existing threat of the landslide, the road and the cycling path were closed. The railway line stayed open but with a speed limit because it could also be affected by sliding trees. After the first cleaning works an extra wooden wall above the retaining wall was built to allow the road opening. The cycling path remained closed the entire time during stabilization works.

The long detours had a negative influence on the turism so local population was pushing for a good, longlasting solution. By the end of June 2016. after completion of the cleaning works, the final area requiring stabilization was defined,

客户

Landratsamt Bodenseekreis

承包商

FSS Felssicherung Inh. Siegfried Simon

防护对象

Road, Railway, Touristic infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Landesamt für Geologie, Rohstoffe und Bergbau

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址