瑞士
瑞士

myGeobrugg

边坡稳定 - Sierra Flor 2016

Complete view of the slopes

边坡稳定 - Sierra Flor 2016

Greening process

边坡稳定 - Sierra Flor 2016

DELTAX® mesh together with erosion control mat

边坡稳定 - Sierra Flor 2016

After complete revegetation, the slope stabilization system will be nearly invisible.

边坡稳定 - Sierra Flor 2016

Stabilized slope from above

 

安装年份

2016

情况

The road concession, Autopistas de la Sabana, is responsible for link 3 departments of Colombia, starting from Cordoba to Bolivar. Passing the capital of the department of Sucre, (Sincelejo) is the mountainous area of the project, called Sierra Flor. For the construction of the double lane, it was necessary to cut a lot of material on the slope that left the material exposed to erosive factors like wind and water, generating small instabilities that must be controlled.

描述

DELTAX® mesh was installed to stabilize the slope. In some parts of the slope erosion control mats combined with seeding are additionally supporting revegetation. 

客户

Concesion Autopistas de la Sabana

承包商

MyJ Equipos

防护对象

Road

腐蚀保护

GEOBRUGG ULTRACOATING

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址