落石防护 - Samphire Hoe in Dover 2015

Train passing under one of the GBE-1000A (for 1000 kJ) rockfall barriers while under going its final inspection.

落石防护 - Samphire Hoe in Dover 2015

Evidence of rock fall below the cliffs before any remedial measures were taken. Visible is a normal chain link fence, which has previously been breached leading to track closures.

落石防护 - Samphire Hoe in Dover 2015

Cliffs during TECCO® SYSTEM³ stabilization works.

落石防护 - Samphire Hoe in Dover 2015

Rope access techniques in use for drilling and installation of the TECCO® SYSTEM³ stabilization.

落石防护 - Samphire Hoe in Dover 2015

Cliff area stabilized with the TECCO® SYSTEM³. Rockfalls triggered here could over top the rockfall barriers below.

落石防护 - Samphire Hoe in Dover 2015

GBE-500A (for 500 kJ) rockfall barrier below the cliffs. Note the evidence of small rockfalls already stopped by the barrier.

落石防护 - Samphire Hoe in Dover 2015

GBE-1000A (for 1000 kJ) rockfall barriers during installation. Here you can see the final adjustments to the vertical ropes.

落石防护 - Samphire Hoe in Dover 2015

Final checks on GBE-1000A rockfall barrier line. Cliff below stabilized with TECCO® SYSTEM³.

落石防护 - Samphire Hoe in Dover 2015

Final adjustments on the GBE-1000A rockfall barrier. This barrier offers unbeatable installation simplicity.

落石防护 - Samphire Hoe in Dover 2015

Another line of GBE-1000A rockfall barriers during final inspection.

落石防护 - Samphire Hoe in Dover 2015

Another view of GBE-1000A rockfall barriers during final inspection.

 

系统长度

446 m - 785 m

 

安装年份

2015

情况

The chalk cliffs at Dover form a vital element of the Kent Downs Area of outstanding natural beauty, a nationally important and protected landscape. Samphire Hoe is a new piece of land created by Eurotunnel during the construction of the Channel Tunnel.


Samphire Hoe cutting has a history of rockfall, with previous failures landing on the track.
The design remit was to extend the life of the earthwork such that there is a reduced likelihood of speed restrictions or line closure due to rockfall.


Tactile inspection by Fairhurst revealed the main mechanisms of slope instability to comprise ravelling across the slope face, caused by surface weathering and preferential erosion of weaker chalk horizons, together with more localised toppling, wedge sliding and planar sliding failures of individual blocks.

描述

Working alongside Fairhurst - Consulting Structural and Civil Engineers of Glasgow CAN Geotechnical Ltd. undertook the installation of 13 individual Geobrugg rockfall barriers. The GBE range of barriers were chosen for their ease of installation. Their low anchor forces meant shorter anchors with the resultant decrease in drilling time, allowing for a far shorter program.  The strict vertical drop testing and certifications that come with these fences meant that the only choice of supplier was the world leading technology innovator Geobrugg.


Rockfall analysis was undertaken by Fairhurst and the system energy and height were specified from this point forward. In total 785 metres of GBE-500A and 446 metres of GBE-1000A have been installed between Abbotscliffe and Shakespeare Tunnels. The barriers were used in combination with localised areas of Geobrugg high tensile TECCO® SYSTEM³ flexible facing in total 3150 square metres of TECCO® G65/3 and 350 pieces of P33 system spike plates were installed.

客户

Network Rail Ltd.

承包商

CAN Geotechnical Ltd.

防护对象

Railway

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

Fairhurst - Consulting Structural and Civil Engineers

其他安装的应用程序

边坡稳定

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址