瑞士
瑞士

myGeobrugg

Ringelaier Leite St 2127

边坡稳定 - Ringelaier Leite St 2127 2015

Single rock stabilization with SPIDER®-System.

边坡稳定 - Ringelaier Leite St 2127 2015

Rockfall triggered by rock scaling.

边坡稳定 - Ringelaier Leite St 2127 2015

Closeup view of the very impressive rock that fell due to rock scaling. Workers were able to successfully remove the rock from the roadway.

边坡稳定 - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

边坡稳定 - Ringelaier Leite St 2127 2015

Partial protection with TECCO® SYSTEM³.

边坡稳定 - Ringelaier Leite St 2127 2015

Partial protection with SPIDER®-System.

边坡稳定 - Ringelaier Leite St 2127 2015

Detailed view of SPIDER®-System.

边坡稳定 - Ringelaier Leite St 2127 2015

Excess vegetation must be routinely removed so roots cannot cause increasing amount of pressure and trigger instability in the slope.

 

安装年份

2015

情况

Some 50 years ago State Road 2127 was widened to accommodate increased traffic volume. Sections of rock face adjacent to the roadway required scaling. The material that was removed was reused as part of the pavement. Because of the stability of the local rock, no protection measures were required.

As a consequence of being moderately to heavily saturated over the past 20 years, crevices in the rock fragments have expanded, in most parts by over one meter. The crevices bisect the steep rock face nearly vertically and caused several rockfall incidents in 2014.

The Bavarian Agency for Environment decided to install several single-block stabilization systems. Further actions have not been planned due to costs and environmental protection.

地質學

Quartz / Slate

描述

During rock scaling, those rocks with a volume of up to 6 m³ were removed. Critical sections with reduced stability are now being stabilized with the SPIDER® and TECCO® protection systems.

客户

State Administration Passau

承包商

HTB Kufstein

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

工程

IFB Eigenschenk

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址