瑞士
瑞士

myGeobrugg

赛道 - Red Bull Ring II 2014

Geobrugg Debris Fence installed at the Red Bull Ring

赛道 - Red Bull Ring II 2014

.

赛道 - Red Bull Ring II 2014

Geobrugg Debris Fence installed behind the Service Road. High strength mesh ROMBO till ground to avoid debris behind the debris fence.

赛道 - Red Bull Ring II 2014

.

 
 

系统长度

400 m

 

安装年份

2014

情况

The debris fence of Geobrugg was selected to protect the infield and the new spectator area where temporary grandstands will be erected for the race.

描述

Geobrugg offered the complete turnkey solution including layout design, manufacturing and installation of close to 400 m of our debris fence. With the selection of the FIA debris fence and the adaptation of the system to the local conditions the client made sure that the spectators are protected with the highest standard available.
Key advantages of the system are:
- Tested and designed system
- Fast and easy installation
- 50 cm cable spacing
- Improved spectator protection due to high-tensile wire mesh ROMBO
- Improved spectator vision compared to systems with 25 cm cable spacing

客户

n/a

工程

Geobrugg AG

分包商

Zaunbau Nähr GmbH Austria

本地联系方式

Jochen Braunwarth
   

Jochen Braunwarth

Director Motorsport Solutions

Motorsport
Geobrugg AG,  Director Motorsport Solutions

联系地址