瑞士
瑞士

myGeobrugg

Reconstruction of the National Road D 201-Buzet - GP Požane

边坡稳定 - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Installation of Deltax G80/2 mesh on the cliff.

边坡稳定 - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Drilling for the nails on the cliff.

边坡稳定 - Reconstruction of the National Road D 201-Buzet - GP Požane 2015

Testing of the self-drilling anchors.

 

安装年份

2015

情况

Rockfalls from the cliff were endangering the road below. Because rockfalls are rather small this lightweight solution is ideal.

地質學

Limestone cliff with eroded superficial area (causing small rockfalls).

描述

Slope protection with Deltax G80/2.

客户

Hrvatske Ceste

承包商

Monterra Rijeka

防护对象

Road

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Via-ing Pula

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址