美国
美国

myGeobrugg

边坡稳定 - Pustynnoye Mine 2024

The DELTAX® mesh being placed and secured, anchors and bottom rope visible

边坡稳定 - Pustynnoye Mine 2024

Transport berm in the open-pit mine with protective posts along the slope

边坡稳定 - Pustynnoye Mine 2024

The client’s drilling machine in operation during anchor installation on the steep rock face

边坡稳定 - Pustynnoye Mine 2024

Wide view of the mine with transport roads and haul trucks in operation

边坡稳定 - Pustynnoye Mine 2024

View of the berm after installation, safe passage for mine operations

边坡稳定 - Pustynnoye Mine 2024

Steep quarry slope with visible geological layers and instabilities

边坡稳定 - Pustynnoye Mine 2024

Measurement of rock block behind the mesh after rockfall event

 
 

安装年份

2024

情况

The mining company Altynalmas requested Geobrugg’s support to protect a transport berm in their open-pit mine. Rockfalls from a 100-meter slope posed a serious risk to the entire operation. The following challenges were identified:

  • Berms filled with blasted rock mass from overlying horizons

  • Bulges on the slope with risk of detachment

  • Complex geological structure with a syncline and potential failures such as wedge breaks and backward toppling

Additionally, the client struggled to find a contractor to install rock nails in the remote location. Geobrugg was therefore asked to propose a protection system that could be installed with the client’s own workforce and machinery.

描述

Geobrugg experts assessed the hazardous zones and evaluated different protection options, including the active stabilization system TECCO®, a GBE rockfall barrier, and a drape system with DELTAX® 80/3 mesh. Since there was not enough space to install a barrier and the TECCO® solution would have been too costly for the 100-meter slope—which was not yet in its final contour—the drape system was selected as the most suitable option.

The system was modified with a bottom rope fixed by anchors, as there was no trench or space available to catch falling rocks. Although this increased the load on the system, it was considered the best solution for the road's limited operational period. Geobrugg also advised the mine on drilling and installing anchors using the blasting machine.

A few days after installation, a rockfall of 53 m³ (140 tons, maximum block size 1.45 m) occurred, affecting around 20 meters of the road. The system successfully contained the mass, allowing operations to continue. Thanks to its durability, the DELTAX® 80/3 mesh was later dismantled and reused in another section of the mine, with some parts repurposed for a barrier developed by the mine itself.

国家/地区

哈萨克斯坦

客户

防护对象

Road, Mine / Quarry

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

Saleh Feidi
 

Saleh Feidi

自然災害防護
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

Bryant Jackson
 

Bryant Jackson

自然災害防護
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 美国

联系地址

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / 美国 Regional Manager Rocky Mountains / Central USA

联系地址

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 美国 Regional Sales Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Impact Protection
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / 美国

联系地址