美国
美国

myGeobrugg

边坡稳定 - Purple Rock East 2015

View of stabilized slope from the top

边坡稳定 - Purple Rock East 2015

.

边坡稳定 - Purple Rock East 2015

Drilling works on the top slope

边坡稳定 - Purple Rock East 2015

Installation of TECCO SYSTEM with telescopic crane

 
 

安装年份

2015

情况

Rock slope with risk of rockfall due to fractured and weathered rock mass.

描述

Slope stabilization with TECCO System (G65-3)and anchors of D32 mm every 2 meters.

客户

Autoridad del Canal de Panamá - ACP

承包商

Alvarado & Düring International

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Autoridad del Canal de Panamá - ACP

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址