瑞士
瑞士

myGeobrugg

边坡稳定 - Plaza La Marquesa 2018

Overview stabilized slope

边坡稳定 - Plaza La Marquesa 2018

Drilling anchors

边坡稳定 - Plaza La Marquesa 2018

Installation of TECCO® mesh

边坡稳定 - Plaza La Marquesa 2018

Frontal view of the slope with TECCO® SYSTEM

 
 

安装年份

2018

情况

A slope behind of La Marquesa Mall is almost vertical, so the consultant advised a stabilization with TECCO® G65/3 with passive anchors of 5 meters.

地質學

Lime with sand consolidated

描述

Installaion of TECCO® SYSTEM wit G65/3 mesh, with anchor bars D28 mm, Grad 97 and a length of 5 meters

客户

Desarrollo La Marquesa S.A.

承包商

IDM Ingeniería y Construcción S.A.

防护对象

Residential area

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Tecnilab S.A.

分包商

NDC Geotecnia

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址