瑞士
瑞士

myGeobrugg

落石防护 - Piwniczna Zdrój DK87 2016

GBE-500-A rockfall barrier along the state road DK87 Piwniczna Zdrój

落石防护 - Piwniczna Zdrój DK87 2016

Loose rock above the road

落石防护 - Piwniczna Zdrój DK87 2016

Over 350 meters of road protected by rockfall barriers

 

系统长度

108 m - 252 m

 

安装年份

2016

情况

During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.

描述

To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.

Check also the Piwniczna Zdrój DW97 slope protection project.

客户

GDDKiA Oddział Kraków

承包商

BMD Sp. z o.o.

腐蚀保护

Galvanized

工程

BMD Sp. z o.o.

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址