美国
美国

Piwniczna Zdrój DK87

DK87, 33-351, Piwniczna Zdrój, 波兰
2016
客户
GDDKiA Oddział Kraków
工程
BMD Sp. z o.o.
承包商
BMD Sp. z o.o.
能级
100 kJ, 500 kJ
系统的高度
2.0 m, 3.0 m
系统长度
108 m - 252 m
腐蚀保护
Galvanized
情况

During the construction of the DK87 national road on the section Piwniczna Zdrój, rock fragments falling from the Kicaz mountain slope were identified as a threat to the traffic.

描述

To protect the road from rock chips and boulders, GBE-100-A-R and GBE-500-A rock catch fences were installed in four locations. The total length of all barriers is 360 meters.

Check also the Piwniczna Zdrój DW97 slope protection project.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国