瑞士
瑞士

myGeobrugg

Piwniczna Wierchomla DW 971

泥石流和滑坡防护 - Piwniczna Wierchomla DW 971 2017

Secured road culvert at the DW971

泥石流和滑坡防护 - Piwniczna Wierchomla DW 971 2017

The road culvert before renovation

泥石流和滑坡防护 - Piwniczna Wierchomla DW 971 2017

Installed flexible ring net barrier

 

系统

 

系统长度

5 m - 5 m

 

安装年份

2017

情况

A long and steep culvert under the DW971 in Southern Poland needed frequent cleaning. Also, debris coming down the mountain stream during storms and torrential rains menaced the culvert.

描述

Geobrugg's VX ring net debris flow barriers were chosen because:
- they are easily adapted to the terrain
- they reduce works in winter and
- they reduce concrete stabilization works.

国家/地区

波兰

客户

Zarząd Dróg Wojewódzkich

工程

Drogpol Sp. zo.o.

承包商

Drogpol Sp. z o.o.

分包商

BMD Sp. z o.o.

防护对象

Infrastructure, Other

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址