瑞士
瑞士

myGeobrugg

落石防护 - Opunake 2021

Boarder post with isolations between stainless and Galvanised/Epoxy components

落石防护 - Opunake 2021

Stainless T35 barrier contouring around existing services

落石防护 - Opunake 2021

Support rope separation

 

系统长度

157 m

 

安装年份

2021

情况

The holiday park is located at the bottom of a sea cliff which experiences small seasonal debris and rock releases. The site is located within close proximity to the sea in a C4 environment.

描述

A 157 m and 36 m long, 1.5 m high stainless steel T35 (35kJ) barrier with galvanised and epoxy posts was installed. Stainless steel was selected to guarantee design life in the corrosive C4 environment. The heavy-duty galvanised posts were epoxy coated and electrically isolated between all the stainless connections to eliminate galvanic corrosion. The T35 posts were embedded directly into the ground which enabled a fast, cost effective and flexible installation.

客户

防护对象

Other

腐蚀保护

INOX / STAINLESS

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址