Olt Valley, km 239+500 - 246+500 - Rock

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

GBE-1000A rockfall barrier protecting national road DN7

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

GBE-1000A rockfall barrier base plate anchors drilling works

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Drilling flexible wire rope anchors for the GBE-1000A barrier

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

One of the GBE-1000A rockfall barrier lines, completely installed

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

GBE-1000A rockfall without border post - special solution for direct rock face connection

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Perfect solution containing passive GBE-1000A rockfall barrier and active slope stabilization with nailed TECCO® SYSTEM³

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Another line of GBE-1000A barrier with direct rock face connection

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

Fully installed VX-060L debris flow barrier

泥石流和滑坡防护 - Olt Valley, km 239+500 - 246+500 - Rock 2015

A short - only 22 m long - GBE-1000A barrier along national road DN7

 
 

系统长度

20 m - 50 m

 

安装年份

2015

情况

National road no. 7 (DN7) is one of the most important routes through the Carpathian Mountains, with heavy traffic. The Olt River runs parallel to the DN7 with high mountains, directly next to the road. In winter and spring rockfalls occur regularly. Also with unstable slopes, torrents and avalanches the risk of accidents was high. 

This project was originally developed with five concrete canopies for rockfall protection. Due to costs and other restrictions, a modern solution using high tensile steel wire was chosen. After further investigation, 23 dangerous areas were found and had to be protected using two types of protection systems: active and passive.

描述

GBE rockfall barriers were provided as a passive protection at the following sectors:

1. km 240+454 - 240+510

GBE-1000

  • capacity: 1000 kJ
  • height: 5 m
  • length: 56 m

2. km 240+555 - 240+577

GBE-1000

  • capacity: 1000 kJ
  • height: 3 m
  • length: 22 m

3. km 242+453 - 242+457 (as a debrisflow barrier)

VX-060

  • height: 3 m
  • length: 8 m

 4. km 242+457 - 242+610

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m and 36 m

 5. km 242+859 - 242+940

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

 

6. km 243+099 - 243+179

GBE-1000

  • capacity: 1000 kJ
  • height: 4 m
  • length: 30 m

See also the other projects of Olt Valley.

国家/地区

罗马尼亚

客户

Compania Naţională de Administrare a Infrastructurii Rutiere (C.N.A.I.R.) – Directia Regionala de Drumuri si Poduri Craiova (D.R.D.P.)

工程

A.C. IRIMAT Cons S.R.L.

承包商

S.C. VECTRA GROUP S.A.

分包商

Sachschische Bau GmbH Dresden Germany, Sibiu Branch

防护对象

Road

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

本地联系方式

Saleh Feidi
 

Saleh Feidi

自然災害防護
Impact Protection
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / 美国

联系地址

Bryant Jackson
 

Bryant Jackson

自然災害防護
Impact Protection
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / 美国

联系地址

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

自然災害防護
Impact Protection
Geobrugg North America, LLC,KS 67226 Wichita / 美国 Regional Manager Rocky Mountains / Central USA

联系地址

Robert Long
 

Robert Long

Regional Sales Manager Southeast

自然災害防護
Impact Protection
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / 美国 Regional Sales Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer Sales Director North America

联系地址

Tim Shevlin
 

Tim Shevlin

自然災害防護
Impact Protection
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / 美国

联系地址