Obre Biel, Matterhorn Gotthard Bahn

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

Multi Hazard Barrier protecting Matterhorn Gotthard Railway line against rockfalls, snow slides and smaller avalanches

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

Finite elements based simulation software FARO allowed the correct barrier dimensioning according to the customer requirements

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

Drilling works using walking excavator equipped with drill rig

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

Drilling with casing was necessary due to poor ground conditions and thus unstable drill holes

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

Multi Hazard Barrier during installation - visible already positioned posts with retaining and lateral ropes

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

ROCCO® ring net installation using shackles

落石防护 - Obre Biel, Matterhorn Gotthard Bahn 2016

Fully installed Multi Hazard Barrier with special gap filling adjustment

 

系统长度

28 m - 112 m

 

安装年份

2016

情况

The railway line Matterhorn Gotthard has a section called Obre-Biel that is being used by as many as  ten passanger trains per hour, along with cargo trains. Over the years, this section of the railway has been inundated by snow slides and smaller avalanches. Consequently, railway traffic has been severly impaired and has also created the danger of possible trail derailment. The line was also endangered by rockfalls.

 

 

描述

The soution shall protect the railway line against snow slides, snow avalanches and rockfalls. Choosing flexible rockfall barriers willl decrease the amount of traffic disturbances.

Standard rockfall barriers are designed to deal with loads caused by rockfalls. So, to serve as a mutli-hazard protection system, some special dimensioning has to be implemented.

Such special dimensioning is not possible without involving computer simulations. For this purpose, Geobrugg uses finite element simulation software called FARO. FARO was originally developed by the Swiss Federal Institute for Forest, Snow and Landscape Research, and WSL, in order to simulate rockfall barriers with ring nets.

Further software development financed by the Commision for Technology and Innovation CTI allowes surface load simulations caused by debris flows, shallow landslides and avalanches.

By using FARO software, a total of 182 meters of rockfall barriers were correctly dimensioned to protect the railway line. They were finally divided into three lines of 112, 42 and 28 meters.

客户

Matterhorn Gotthard Bahn (MGB)

承包商

ABA Bautec AG

防护对象

Railway

腐蚀保护

Galvanized, GEOBRUGG SUPERCOATING

工程

geoformer igp AG (wasser/schnee/lawinen - André Burkard AG)

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址